From: route@monster.com
Sent: Saturday, April 16, 2016 2:05 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
DONALD RUDY HEDGES
8607 SE MORRISON ST,
PORTLAND, OR 97216 PHONE: (971) 222-7835 – RudyHedges222@Gmail.com CONSTRUCTION PROJECT MANAGER PROFESSIONAL
OBJECTIVE To
obtain a position with your company that leverages my achievements, strategic
thinking, and technical abilities in addition to allowing me to acquire new
skills and become more intelligent and diverse throughout the business. QUALIFICATIONS
SUMMARY Results
oriented professional with demonstrated achievements in positions of
responsibility and complexity. Innovative, dynamic, detail oriented
self-starter with a solid background offering a unique and diversified
combination of experience within the technical construction industry. Proven
ability to set realistic priorities and complete multiple projects
simultaneously while maintaining high levels of competent decision making,
problem solving and organizational effectiveness. Multi-industry experience
has added to existing ability to maintain an open mind and communicate
effectively with a widely diverse group of individuals on all levels of an
organization. Demonstrated ability to lead, motivate, and train others while
maintaining ability to function effectively and independently. Supportive
team leader has exceptional inter-personal and communication skills and
communicates well with technical and non-technical colleagues at all levels.
Independent and hardworking team player excels in technical and construction
environments while following complex system designs and utilizing
leading-edge tools and equipment. Troubleshooting ▪ Tiger Teams Manager ▪ Full Site
Builds ▪ Crew Training ▪ Excel Site Testing ▪ Making Lights Turn Green ▪ Process
Improvement ▪ Coax and Fiber Cables ▪ Anritsu Tools Project Management ▪ Customer Service ▪ Cross-team
Collaboration ▪ Roadblock Removal APPLICABLE
PROFESSIONAL EXPERIENCE T-Mobile (Direct through WAVSYS) 8960 NE Alderwood Rd, Portland, OR Supervisor Name: Jai Rajan – (817) 504-3828 Construction Project Manager – 03/2015 – Present -Manage
site construction, Tiger Team deployment, troubleshooting, resolution. Manage
Sub Contractors. Manage Crews. Manage vendors and peers to clarify and
confirm expectation, report progress and to establish rules, stipulations and
logistics for LTE, UMTS, NSB, and Microwave site construction. Read,
understand, and interpret Engineering Specifications, RFDS, Blue Prints, and
Construction Drawings, Fiber Optic Installation, RRH/RRU Installation, Coax
and Antenna Installation; Sweep Testing and PIM Testing, Roof top,
Self-Support and Monopole Installation, Project Tracking and Reporting,
Change Order processing, Close Out Package reconciliation, Job Completion
Notification, Invoice approvals, and Financial True -ups. Reconcile local and
National quality audits and NICAT. Manage SOW creation, Participate in
Scoping Walks and Meetings. Provide Construction expertise to A&E for FCD
creation, Redlines. Manage Material ordering and BOM creation. Manage RFQ
process for Structural upgrades and Tower replacements. Participate in the
deployment of multiple technologies in multiple markets. Manage projects of
greater difficultly and complexity. Provide input for forecasting and
schedule. GC selection. Provide Construction Expertise to Site Acquisition
for Business Decision approvals. Donald
(Rudy) Hedges
Page II Velocitel, Inc. for AT&T 4004 Kruse Way Pl. Lake Oswego, OR Supervisor Name: Leigh Walker – (610) 324-6239 /
Steve Handy – (503) 729-7862 Tiger Teams Manager / CPM – 01/2013 – 03/2015 -I
was employed as a Tiger Teams manager at Velocitel Inc.; Turf Vendor for
at&t. In the Tiger Teams department I responded with ultimate urgency to
integration-ceasing issues usually related to faulty equipment, commissioning
scripts, or workmanship. I worked with crews directly & assisted with
remote troubleshooting & resolution. I had heavy focus on technical
expertise but also kept strict adherence to P&L. Our turn-around time
from notification to resolution for the client was the best in the region.
I’d also served as an LTE & UMTS Construction Manager for Velocitel
directing & supervising crews building LTE & UMTS expansion which
often involved replacing towers & overcoming the associated endless
obstacles of managing many replacements at one time. I utilized countless
resources including construction drawings, RFDS, & OOM. Balancing
workflow, scheduling all work with Contractors, inspections, forecasting
construction & a multitude of other milestones, meeting aggressive deadlines,
meeting challenges with superior customer service & interaction, &
completing detailed reporting & close-outs. I’ve consistently gone above
& beyond for the customer while stopping at nothing until the job had
been done properly to the finish with the highest quality standards with
TL9000 emphasis. I utilized and expanded my expertise in customer service
& maintenance in all performed works. From a technical, engineer, &
management background, I was able to see through every project aspect &
be heavily relied upon by crews, colleagues & customers at once. I left
Velocitel of my own accord to pursue an opportunity to work directly for a
carrier. Mycom U.S.A. Inc. for AT&T 12780 NE Marx St. Portland, OR Supervisor name: Peter Lee – (310) 920-9955 Field Manager, Field Coordinator, Construction
Manager – 06/2011-01/2013 Technician, Telecom Equipment Installer,
Troubleshooter – 03/2011-06/2011 -For
Mycom, I had approximately 1 year of experience managing construction and
technician crews for at&t, and T-Mobile, as well as Sprint LTE
cell sites. I’ve worked on every project from UMTS T1’s, UMTS expansion to,
TELLABS & ALU SIAD installation, Provisioning, Integration, T1 circuit
growth, fiber circuit growth, LTE, and every aspect of the new equipment implementation.
My customers have included the above referenced carriers as well as Century
Link, Frontier, and other Local Exchange Carriers to maintain the highest
possible network integrity for wireless through each system. I remained
involved in all aspects of work through-out my management transition, and
continued to be a highly relied-upon technician for special high-priority
projects and troubleshooting. AT&T (Direct through TEK Systems) 9600 SW Barnes Rd. Beaverton, OR Supervisor name: Nick Fitzsimmons – (509) 280-7722 Manager: Byron Jarnagin – (503) 550-3253 Telecom Equipment Installer – 09/2008-03/2011 -For
TEK Systems I‘ve worked on contract for at&t, Comcast cable and other
telecom companies. I worked in at&t cell sites implementing T1's, L2 testing
with a JDSU 9000 T1, T3, fiber, and Ethernet analyzer, loading and editing
SIAD configuration files, all aspects of implementing the SIAD unit,
troubleshooting and resolving issues with connectivity, and all other aspects
of at&t's network expansion. I worked with ALU techs and Project Managers
on site for integration of SIAD unit. I installed network equipment and
modules into equipment racks and ran cables such as COAX, CAT-5/6,
fiber-optical, ethernet, & copper power wire in Central Offices and Switches.
Worked with Cisco 10K Router, ARPD, VOD, & Path-track. I also did Node
segmentation. I Installed equipment for distribution of Internet, Broadcast,
Narrowcast and Video On Demand. I installed Aurora forward & lasers
to move legacy Analog nodes to Digital Video distribution. I installed 2,4
& 8 way Splitters, Combiners & Amplifiers for Broadcast &
Narrowcast Feeds. I installed & terminated Coax, Fiber, Cat5 and
Cat6 cables. I installed Cisco 6500 routers & 3750 switches. Installed
new Aurora fiber router equipment. I performed grounding of cell sites,
halo’s, equipment & generator rooms. I installed new fiber trays
& performed fiber testing with GPRS Experience. Donald
(Rudy) Hedges
Page III ADC Telecom / CWF Telecom for AT&T 14375 NW Science Park Drive Portland, OR Supervisor name: Brian Albers – (503) 551-7118 Telecom Equipment Installer – 02/2009-03/2010 -For ADC I’ve worked on temporary contracts for at&t and
other telecom companies. I installed various equipment in switches and cell
sites, including seismic zone 3 racking, from the ground up. From drilling
the holes, placing/shimming the racking straight & Level, bolting them
down, grounding the frame, installing the equipment, running the power,
constructing fiber management troughs/downspouts/etc, running fiber-optic
cables, 25-pair tip & ring, 12-pair coax, & installing the various
connectors. I also laced all the cabling into frame horns, ladder racking or
other cable management, I custom built all uni-struts and frame mounting
pieces, and all to strict at&t standards & protocols. I also passed the ATT-TP76300 installers quiz and did much reading into & familiarizing with ATT-TP76303 engineering manual. UMTS, TELLABS, ALU experience. MJH Telecom Based in Tampa Bay, Florida Supervisor Name: Mark Hillegas – (813) 601-0362 Telecom Installer / De-installer – 11/2008-12/2008 -For
MJH Enterprises I traveled the country on temporary contract for Alltell
wireless; a predominantly East coast cellular phone company. My work took me
to Seattle, WA, Houston, TX, Atlanta, GA, New Orleans & Baton Rouge, LA,
and Raleigh & Greensboro, NC. I ran and supervised a crew of 3 driving a
26,000 lb GVW truck de-installing analog cellular frames containing sensitive
components and various power and communication cables with the utmost of care
and safety. We completed roughly 7 cellular tower sites per day, and
performed various other tasks for the carrier. Tecom Inc. / Ciber Inc. Contractors for the United States Government
Department of Energy (USDOE) (Bonneville Power Administration) 905 NE 9th Ave. Portland, OR Supervisor name: (Tecom) Mike Wiese – (503) 230-5730
/ (Ciber) Linda Sheals – (503) 230-4723 Sound Engineer/Data Management Analyst I/Courier
Delivery – 10/2003-11/2008 -Tecom was a great place to work. I did a variety of tasks
with high responsibility and little to no supervision. I worked directly in
conjunction with local news channels and government officials. This included
setting up and troubleshooting 3 different large P.A. systems with wireless
microphones, audio/visual equipment & telephone/teleconference bridges. I
set and checked calendars for customers using Outlook, performed
administrative assistance, maintained confidential office files and prepared
reports for building maintenance. -Ciber was my favorite place to work. The company picked
me up after they won a contract from my previous employer; Tecom Inc. They
only picked up about 50% of the previous employees, and I was fortunate and
proven well to make the cut. I performed a lot of the same job duties that I
did with Tecom, except I moved on from sound engineering to Database
management. My rate of pay was and my responsibilities were both increased
dramatically. I have many positive references from Ciber Inc. which includes
letters of recommendation from my supervisors and managers. Donald
(Rudy) Hedges
Page IV EDUCATION -Nokia*Siemens
BTS Commissioning and Integration school for T-Mobile. Also passed
Riggers course to coordinate tower crews installing antennas, diplexers,
radios, Surge Junctions, and other tower hardware. -AT&T
focus training on ATT-TP76300 and ATT-TP76303 - Portland, OR: 2008. Passed
quiz with a 94% on my
first attempt and have kept up on all current revisions. -Jefferson
High School - Portland, OR: 1994-1995. GPA: 4.0. General studies,
television production, journalism,
jazz band, concert band. -Portland
Community College - Portland, OR: 1996. Testing determined no need for
further study to acquire
Diploma equivalent. I passed all tests with above average scores first attempt
at age 16 and went to work. -Self
Enhancement Incorporated - Portland, OR: 2000-2001. Sound engineering,
recording production, song
Composition and theory. REFERENCES
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||
|
|